Its a block party!
In the words of Ice Cube, today was a good day. Lots of body work was completed on the quarters, the bottom of the hood and bottom portion of the bed floor was sprayed with epoxy. Once the epoxy was dry the bed floor was sprayed with bed liner. Tomorrow we plan on flipping the bed floor over, spraying epoxy on it and bed lining it as well. We will also spray the top side of the hood with high build epoxy and I hope to re-prime the bedsides. Its a tall order but we are really close to finishing up the body work on the bedsides.
Posted on April 19, 2018, in 1971 C10 and tagged 1971, 1971 C10, auto body repair, auto body shop, auto paint, autobody repair, automotive paint shop, Body Filler, body repair, body repair shop, body shop, body work, Burlington NC, C-10, C10, Chevrolet, Chevy, Coach repair, epoxy primer, Hyundai, Jmc Autoworx, Motor home repair, Paint, Paint and body shop, paint shop, ppg, PPG Paint, PPG Refinish, Prime, primer, priming, Raptor Liner, re, restoration work. Bookmark the permalink. Leave a comment.
Leave a comment
Comments 0