Time to shine!
Its been a long time coming but we are finally spraying some color on the C-10 project. We had intentions on painting both bedsides today but when we were prepping them, we found a spot on one of them that wasnt up to snuff. So it came back out for repair and we slid the radiator support in in its place. These parts were sealed with PPG’s urethane sealer followed by 3 coats of PPG base coat then 3 coats of clear. Things went smoothly and the turned out very nice. The color looks amazing. We will wet sand and buff the outside of the bedside before reassembly. Hopefully we will get another batch of parts painted in the next couple of weeks.
Raptor liner
After a few good days of prepping the floor and bottom of the cab we were finally able to spray it. The first couple of pictures show how not prepping panels properly turn out. The black peeling paint is actually POR 15. It was improperly applied so we removed it before applying our coatings over it. We started with a coat of PPG’s DPLV epoxy primer over the bare metal and properly prepared panels. We actually did that yesterday afternoon. This morning we came in applied SEM seam sealer to the seams and the weld areas where patches were installed. Once the seam sealer was dry, Jordan sprayed 2 coats of Raptor liner over the DP. This well provide a water proof barrier for the under side of this truck that will still look very nice. While we were at it, we also sprayed the inside of the bedsides that are exposed to the bottom of the truck. Up next, its time to start spraying some panels while we finish up the body work on the cab.
Bottoms up
Still plugging away on the C-10. Last week we finished up the body work on the cab and applied a couple more coats of PPG’s high build epoxy. Because the body work was so extensive we will definitely block that out and prime it again to be sure we didnt miss anything. Today we started prepping bottom of the cab for bedliner. As you can see it was blasted giving us a good starting point. You can see there are new patches in the floors in the top corners. Those areas were a little thin and the cab mounts needed to be shored up some as well. While Jordan sanded the bottom, Paul got a great start on straightening out the rockers. We still have a bit of sanding to do on the floor and more work on the rockers but over the next couple of days we should be able to get the bottom of the cab sprayed with epoxy followed by a couple coats of Raptor liner.
C-10 Cab
After many hours of blocking a filling, the cab on the C-10 is pretty close to being straight. Yes, this one lived the life of a truck but glory days are in its future. With all the body work fairly close to being finished we will next turn our attention to the floor and bottom of the cab. Just like the rest of the underside on this truck it will get a bedliner both inside and out. We will then once more make sure the bodywork is complete before priming. Because of the extensive body work, we will most likely prime it twice to be sure its good to go.
All hands on deck
Great progress was made on the C-10 project today. Cole and I worked a good portion of the day blocking out the roof and fixing dents. We worked some on the inside of the cab as well as the left door jamb. The fire wall is pretty close to being finished as well. Tomorrow we plan on attacking it like we did today and hopefully that will put us pretty close to priming it again.
C-10 body work continues
The progress continues on the C-10. We are working hard to make sure the body work on the cab is as nice as the rest of the panels we have ready to paint. The cab needs pretty extensive body work but each day we get a little closer.
4 more ready
We have been working hard on the C-10, and it shows. We now have 4 more parts ready for paint. Cole and Jordan finished blocking these panels out today and Paul had just enough time to spray a few coats of urethane primer on them before quitting time. These panels will be blocked one final time to be certain they are nice and straight before painting.
Tubs are painted
Last week the work continued with the C-10. Paul sprayed the engine compartment sides of the wheel houses and did a spray in bedliner on the wheel house side of them They really look nice. Paul also was able to get the epoxy high build primer on the doors and fenders last week. Jordan got to work blocking them today. He did have a couple of places appear on the right fender so he went ahead and fixed that while he was at it. These will continue to be blocked out tomorrow and hopefully these parts will soon be in their final urethane primer in a couple of days
C10 in progress
Over the past couple of weeks we have been plugging along on the C10 project. Repairs on the cab are moving along. The firewall is pretty smooth, work on the cab continues and work on the doors has begun. Although these are new doors they still came with a few dents that needed attention. We blocked them out to find the low spots and high spots then straightened them out. We will be applying our high build primer over these doors in the next day or so and they will receive another blocking followed by a final prime with regular urethane primer. Once that happens we will have 2 more panels ready for paint.